05
Load-in
Forty contractors, one bay, a window nobody will extend. The schedule is the real design constraint, and it forces decisions upstream into the way the stand is packed.
Mid-morning on the first build day: the queue is already out on the public road.
Photo: Tom Jackson / PexelsEntries in Load-in
3 entries- 05.01Bay schedulingForty contractors share one loading bay across a fixed window. The schedule is the real design constraint.
- 05.02Plant and forkliftsBooked by the hour, shared, and the reason nothing heavy is ever hand-carried.
- 05.03Flight casesBuilt around the object, wheeled, numbered, and stored for the whole show.
The schedule is the only drawing on a build that everybody obeys and nobody keeps.