Every entry is a build problem with a clock on it: method, tolerance, and what goes wrong when the schedule slips.

01

Frame

The structure is rented, bolted and numbered because the schedule allows nothing else. What follows from that: how systems make bays, where custom joinery earns its cost, what a truss is really carrying, and how much adjustment a hall floor demands.

Two workers on a scissor lift inspect a triangulated steel roof truss structure
Fig. 01

Day one, mid-sequence: uprights and primary horizontals set, secondary framing following behind, crates still on the floor.

Photo: Jimmy Nilsson Masth / Pexels

A structure that takes a week to build cannot exist here, so nothing on it is permanent and everything on it is numbered.